DETAILS:
This multi-functional winery was built to accommodate two laboratory rooms, conference area, and restroom.
TIME TO COMPLETE:
40 days from delivery to occupancy.
SPECIAL FEATURES:
The Bronco Wine Company was in need of a structure that would provide office space, meeting space, and testing rooms. This building was designed to be 14’ wide and with an increased ceiling height of 9’ to create a more open feel within. The flooring was upgraded to an Armstrong Medintech sheet vinyl to withstand wear and tear due to the lab and testing uses, as well as provide a product that could easily withstand surface contact with wine products and byproducts.