DETAILS:
Corban University was in need of additional space due to increasing student enrollment.
TIME TO COMPLETE:
60 days from delivery to occupancy.
SPECIAL FEATURES:
This classroom building was value-engineered to effectively manage time and cost constraints. The interior of the building includes 4 large classrooms, storage room, mechanical room, 9’ tape and textured walls and 4’x4’ windows. The exterior of the building includes a combination of no groove cement panels with clear cedar batts and cement lap siding under the windows and on gable ends and a 9’ x 12’ covered entry with double ½ lite entry doors.