New and Noteworthy

Unlock the potential of modular construction with our insightful blog. Discover the advantages, innovations, and success stories in this growing industry. Dive in now!

Silver Creek Church

Silver Creek Church needed additional space for pantry storage and classroom space. They decided a modular solution was the best fit due to its faster construction schedule and customization options. They decided to work with Pacific Mobile Structures because of their ability to get them what they needed, when they needed, and how they wanted it – all with the ultimate speed and ease.  

Pacific Mobile Structures provided three buildings over the span of 10 years – a 28X64 classroom in 2013, a 36X60 office with a restroom in 2019, and finally, a 24X60 mobile office in 2023. The buildings were placed directly across from the existing church building and next to it. 

The 36X60 office with a restroom and the 24X60 mobile office were both split to match the original 28X64 classroom provided in 2014. All the buildings feature cool white VWSR on their interiors and half lite windows installed on the doors. The exterior of all the buildings feature T1-11 siding with skirting to match and horizontal sliding windows for easy access. The 24X60 mobile office features ADA ramp access.  

For over a decade, Silver Creek Church has had a trusted partner in the modular construction industry for all their space needs.

SHARE POST

Subscribe to Our Blog

Related Posts

10 Benefits of Modular Construction for Nevada Businesses

Discover how modular construction is transforming the building landscape for Nevada businesses. From faster timelines to eco-friendly practices, explore ten game-changing benefits that make modular construction the ideal choice for companies seeking efficient and adaptable solutions.

Read More »

OSU Agricultural Research Center

Pacific Mobile Structures, in collaboration with Northwest Building Systems, delivered a 1,904-square-foot Education Building for Oregon State University’s Agricultural Research Center in Burns, OR. Designed for environmental research on cattle, the building features a flood-resistant foundation, sustainable Forbo Marmoleum flooring, and a custom HVAC system. With a durable 5/12 pitched metal roof and an open, flexible interior, this facility supports OSU’s critical research while blending seamlessly with the campus environment.

Read More »

Kirkland Middle School SAGE Complex

Pacific Mobile Structures partnered with Blazer, Portland State University, and Integrus Architecture to deliver a cutting-edge modular facility for the Lake Washington School District. The Kirkland Middle School SAGE Complex in Kirkland, WA, spans 13,328 sq. ft. across 17 modules, seamlessly integrating with the existing campus under the KCDA Cooperative Purchasing Agreement.

Designed to address the district’s growing classroom needs, the facility includes dedicated science labs, a cooking kitchen, and a striking 17-foot-high hallway flooded with natural light. Sustainability and energy efficiency were prioritized, meeting Portland State University’s SAGE standards with features like 100% fresh air ventilation, occupancy sensors, and a reflective TPO roof.

By completing 80-90% of the construction offsite, Pacific Mobile Structures ensured minimal site disruption, efficient costs, and timely delivery for the new school year. The SAGE Complex demonstrates the flexibility, efficiency, and quality achievable through modular construction while fostering an exceptional learning environment.

Read More »