New and Noteworthy

Unlock the potential of modular construction with our insightful blog. Discover the advantages, innovations, and success stories in this growing industry. Dive in now!

Three River HomeLink

Three Rivers HomeLink

Richland School District needed a building to house its HomeLink students who combine curriculum between the district and home. Three Rivers HomeLink demonstrates a complete construction project from the ground, up. A free-standing entry canopy welcomes students, staff, and families to this full school campus that was completely built during summer break.

This building accommodates Kindergartners through 12th graders and their individual needs. It does not appear to be a modular structure from the outside or once inside. The science lab includes the required safety shower. Music rooms include practice areas for students. The multi-purpose room serves as a physical education facility, as well as a general meeting area and a cafeteria with a full kitchen. The staff break room also includes a kitchen facility. The front reception area combines with the main office. Eleven offices house administrators and consultants; providing room for staff to meet with students and parents. A library also fulfills the needs of all grade levels. Restrooms are available to students, staff and one at the front for visitors too.

SHARE POST

Subscribe to Our Blog

Related Posts

Pawnee ISD Education Building

Pacific Mobile Structures recently completed a 5,280-square-foot permanent modular education building for Pawnee Independent School District (ISD) in just 66 days. In partnership with Palomar Modular Buildings, Villagomez Engineering, and L & I Transport Inc., we provided a timely solution to the district’s urgent need for space due to growing student numbers. Despite challenges like limited site space and weather delays, we delivered the project on time.

The new facility includes five classrooms, two locker rooms, and two restrooms, with fire sprinklers, epoxy flooring, and brick wainscoting to match the existing school. Cost-effective modular construction allowed Pawnee ISD to complete the project without a bond, preserving financial flexibility. This successful collaboration underscores our commitment to delivering quality, efficient modular solutions for educational needs.

Read More »

Yakima School District Discovery Early Learning Academy

The Yakima School District faced an urgent need for additional space to accommodate the growing number of children enrolling in their daycare program. Recognizing the need for a rapid and cost-effective solution, they chose to expand their existing facilities with a modular building. This approach not only ensured timely completion despite unforeseen challenges but also offered superior quality and budget predictability compared to traditional stick-built construction.

Read More »