New and Noteworthy

Unlock the potential of modular construction with our insightful blog. Discover the advantages, innovations, and success stories in this growing industry. Dive in now!

Shoalwater Bay Medical Clinic

This medical clinic was built to accommodate the Shoalwater Bay Tribe with medical, dental, mental health and counseling services. 

This two-story medical building was designed to blend in with the existing campus surroundings. Situated less than 200 feet from the Pacific Ocean, the clinic had to be specially engineered to meet a 100 mph exposure D wind rating. This building features an elevator and lifetime warranty fiberglass exterior doors.

SHARE POST

Subscribe to Our Blog

Related Posts

Pawnee ISD Education Building

Pacific Mobile Structures recently completed a 5,280-square-foot permanent modular education building for Pawnee Independent School District (ISD) in just 66 days. In partnership with Palomar Modular Buildings, Villagomez Engineering, and L & I Transport Inc., we provided a timely solution to the district’s urgent need for space due to growing student numbers. Despite challenges like limited site space and weather delays, we delivered the project on time.

The new facility includes five classrooms, two locker rooms, and two restrooms, with fire sprinklers, epoxy flooring, and brick wainscoting to match the existing school. Cost-effective modular construction allowed Pawnee ISD to complete the project without a bond, preserving financial flexibility. This successful collaboration underscores our commitment to delivering quality, efficient modular solutions for educational needs.

Read More »

Yakima School District Discovery Early Learning Academy

The Yakima School District faced an urgent need for additional space to accommodate the growing number of children enrolling in their daycare program. Recognizing the need for a rapid and cost-effective solution, they chose to expand their existing facilities with a modular building. This approach not only ensured timely completion despite unforeseen challenges but also offered superior quality and budget predictability compared to traditional stick-built construction.

Read More »