New and Noteworthy

Unlock the potential of modular construction with our insightful blog. Discover the advantages, innovations, and success stories in this growing industry. Dive in now!

Pacific Mobile Modular Nurse Administration Building

The COVID-19 Global Pandemic left King County overwhelmed with patients and nowhere to go. Needing a solution fast, they began putting up a temporary camp going up to alleviate overflow. But, when the buildings from another contractor got there, the hospital was extremely disappointed to find that the buildings needed to be completely refurbished onsite. Out of time and desperately needing a reliable solution, they felt like they had nowhere to turn.

One of our sales representatives, Bud Smith, heard from a subcontracting partner about the situation on the ground and we wanted to help. People’s lives were at stake and there was no time to waste. Bud reached out on a Friday, heard back on Saturday, and by Monday morning, the deal was signed and ready to go.

Within three days, the 1,792 sq. Ft. brand-new modular building was delivered and installed, ready for use. King County was ecstatic and relieved to have not only a fully-functional, turn-key modular building but one that was brand new and “gorgeous.”

We feel humbled to have had the opportunity to be a frontline responder for those working tirelessly on the frontlines of COVID-19 and serve King County during the most unprecedented times.

SHARE POST

Subscribe to Our Blog

Related Posts

Hope Lane Project

A large gas and electric company had to leave a leased location and found it to be an opportunity to purchase property for a new location in a nearby city. The property was an open asphalt lot with nothing but a small building that was in use by the previous owners. The company needed to be operational at their new property in a matter of months, so they turned to Pacific Mobile Structures.

Read More »

Silver Creek Church

Silver Creek Church needed additional space for pantry storage and classroom space. They decided a modular solution was the best fit due to its faster construction schedule and customization options. They decided to work with Pacific Mobile Structures because of their ability to get them what they needed, when they needed, and how they wanted it – all with the ultimate speed and ease.

Read More »

Clayco South Pier Logistics

Clayco undertook the construction of a significant mixed-use tower, encompassing retail, residential, and hospitality spaces on the revitalized Tempe Town Lake. Pacific Mobile Structures provided four 24X60 buildings.

Read More »