New and Noteworthy

Unlock the potential of modular construction with our insightful blog. Discover the advantages, innovations, and success stories in this growing industry. Dive in now!

Central Kitsap

Central Kitsap

Silverdale Elementary lacked the space to accommodate the community’s growing student enrollment and district leaders required a solution that would provide students with a high-quality, healthy learning environment quickly. The solution: a five classroom, 7,500 sq. ft. Smart Academic Green Environment (SAGE) school.

By combining the latest thinking in healthy learning environments with the best in green building practices, the SAGE classroom provides resource-efficiencies that improve the student experience and the bottom line for administrators. Features of the building include upgraded HVAC systems with energy recovery ventilation for healthier air, noise reduction and energy conservation, twice the amount of window square footage compared to standard relocatable classrooms, natural ventilation from operable windows and low-velocity fans, efficient mechanical and lighting system designs, and a unique 17-foot, light-filled corridor created from roof and floor modules. A white TPO roof refracts the sun to regulate interior temperatures for increased comfort and reduced energy costs. BioPCM, a phase-change material in the walls, reduces HVAC power consumption by 35 percent while maximizing energy savings.

The Silverdale Elementary SAGE school is the first of its kind, representing an evolution from SAGE classrooms to larger, more complex SAGE school buildings. In collaborative partnership with Portland State University and building manufacturer Blazer Industries, Pacific Mobile has installed more than 100 SAGE classrooms throughout WA and OR since 2013.

SHARE POST

Subscribe to Our Blog

Related Posts

Pawnee ISD Education Building

Pacific Mobile Structures recently completed a 5,280-square-foot permanent modular education building for Pawnee Independent School District (ISD) in just 66 days. In partnership with Palomar Modular Buildings, Villagomez Engineering, and L & I Transport Inc., we provided a timely solution to the district’s urgent need for space due to growing student numbers. Despite challenges like limited site space and weather delays, we delivered the project on time.

The new facility includes five classrooms, two locker rooms, and two restrooms, with fire sprinklers, epoxy flooring, and brick wainscoting to match the existing school. Cost-effective modular construction allowed Pawnee ISD to complete the project without a bond, preserving financial flexibility. This successful collaboration underscores our commitment to delivering quality, efficient modular solutions for educational needs.

Read More »

Yakima School District Discovery Early Learning Academy

The Yakima School District faced an urgent need for additional space to accommodate the growing number of children enrolling in their daycare program. Recognizing the need for a rapid and cost-effective solution, they chose to expand their existing facilities with a modular building. This approach not only ensured timely completion despite unforeseen challenges but also offered superior quality and budget predictability compared to traditional stick-built construction.

Read More »