New and Noteworthy

Unlock the potential of modular construction with our insightful blog. Discover the advantages, innovations, and success stories in this growing industry. Dive in now!

The Wine Group

California Winery

This building was built as a laboratory and office space for a winery. 

The 108’ x 50’ and 24’ x 34’ “L” shaped laboratory features exterior lap siding, 18” mansard accentuating the roof line of the modular, perimeter chassis for a permanent foundation, HVAC spit system with hepa filters, custom fume hoods, specialty UV lighted rooms, acid resistant work stations, Orion chemical piping for acid disposal, eye wash and emergency shower station. All interior walls are deck to deck for sound dampening. All the laboratory areas were finished with green board under the tape, texture, and paint to block moisture.

SHARE POST

Subscribe to Our Blog

Related Posts

Pawnee ISD Education Building

Pacific Mobile Structures recently completed a 5,280-square-foot permanent modular education building for Pawnee Independent School District (ISD) in just 66 days. In partnership with Palomar Modular Buildings, Villagomez Engineering, and L & I Transport Inc., we provided a timely solution to the district’s urgent need for space due to growing student numbers. Despite challenges like limited site space and weather delays, we delivered the project on time.

The new facility includes five classrooms, two locker rooms, and two restrooms, with fire sprinklers, epoxy flooring, and brick wainscoting to match the existing school. Cost-effective modular construction allowed Pawnee ISD to complete the project without a bond, preserving financial flexibility. This successful collaboration underscores our commitment to delivering quality, efficient modular solutions for educational needs.

Read More »

Yakima School District Discovery Early Learning Academy

The Yakima School District faced an urgent need for additional space to accommodate the growing number of children enrolling in their daycare program. Recognizing the need for a rapid and cost-effective solution, they chose to expand their existing facilities with a modular building. This approach not only ensured timely completion despite unforeseen challenges but also offered superior quality and budget predictability compared to traditional stick-built construction.

Read More »