New and Noteworthy

Unlock the potential of modular construction with our insightful blog. Discover the advantages, innovations, and success stories in this growing industry. Dive in now!

Aspire – North Thurston School District

North Thurston School District needed a place for talented and gifted middle school students to interact with new STEM technology, but they were limited on space in their existing buildings – both stick built and modular structures, and within their property boundaries. What’s more, the two existing 28X32 modular buildings onsite were aging, so they were also looking to upgrade. Additionally, they needed to expand their facilities in a way that wouldn’t disrupt the residential neighborhood sitting directly behind their property. 

They’d been working with Pacific Mobile for over a decade and turned to them to provide a 10,472-square-foot building to house three cutting-edge science laboratories, two math classrooms, and one robotics laboratory complete with laboratory prep areas and storage rooms. 

The building was placed on the back corner of the school lot and designed to maximize the footprint based on the constraints of the property lines of the site.  

The interior of the building features a generous amount of gas piping, chemical resistant countertops, gas turrets and air reels at every laboratory station, custom fume hoods, an acid storage tank, chemical storage rooms, seven emergency eye washing stations, three emergency showers and over 190 lineal feet of cabinetry and counter tops. 

The exterior of the building features push-button doors, a 312-transverse hinged roof, 5/16” fiber cement panel – 4X10 sections and fiber cement lap siding with 4-inch exposure, 12 aluminum and 18 vinyl storefront windows, recessed side entries, and a rain screen.

SHARE POST

Subscribe to Our Blog

Related Posts

Pawnee ISD Education Building

Pacific Mobile Structures recently completed a 5,280-square-foot permanent modular education building for Pawnee Independent School District (ISD) in just 66 days. In partnership with Palomar Modular Buildings, Villagomez Engineering, and L & I Transport Inc., we provided a timely solution to the district’s urgent need for space due to growing student numbers. Despite challenges like limited site space and weather delays, we delivered the project on time.

The new facility includes five classrooms, two locker rooms, and two restrooms, with fire sprinklers, epoxy flooring, and brick wainscoting to match the existing school. Cost-effective modular construction allowed Pawnee ISD to complete the project without a bond, preserving financial flexibility. This successful collaboration underscores our commitment to delivering quality, efficient modular solutions for educational needs.

Read More »

Yakima School District Discovery Early Learning Academy

The Yakima School District faced an urgent need for additional space to accommodate the growing number of children enrolling in their daycare program. Recognizing the need for a rapid and cost-effective solution, they chose to expand their existing facilities with a modular building. This approach not only ensured timely completion despite unforeseen challenges but also offered superior quality and budget predictability compared to traditional stick-built construction.

Read More »