Edmonds School District

Edmonds School District

These Smart Academic Green Environments were purchased to accommodate the Edmonds School District’s increasing elementary enrollment.

A total of nine classrooms across five campuses were installed for the 2014-2015 school year.The SAGE interior features an energy-efficient ERV (energy recovery ventilator)mechanical system, low velocity fans, vaulted ceiling height and continuous dimming luminary lighting. The interior also features BIOPCM Phase Change Material in the walls that act as a thermal mass to stabilize indoor temperatures.The steel floor structure is designed for longevity and allows for door threshold that is closer to the ground, reducing the costs associated with relocation, maintenance, foundation, stairs and ramps. Options also exist for solar powered sun coolers to eliminate the need for air conditioning, LED pendant lighting and restroom options. The building was also designed to be LEED certifiable. Exterior features incorporate a modern architectural look with large overhangs to protect the building and Hardie reveal siding. The clerestory windows allow the buildings to be sited to take advantage of the most natural daylighting reducing the amount of energy used on interior lights. The buildings incorporate an exterior mechanical room that not only houses the ERV unit but allows the district to enclose a communication IDF (intermediate distribution frame).

SHARE POST

Subscribe to Our Blog

Related Posts

Pawnee ISD Education Building

Pacific Mobile Structures recently completed a 5,280-square-foot permanent modular education building for Pawnee Independent School District (ISD) in just 66 days. In partnership with Palomar Modular Buildings, Villagomez Engineering, and L & I Transport Inc., we provided a timely solution to the district’s urgent need for space due to growing student numbers. Despite challenges like limited site space and weather delays, we delivered the project on time.

The new facility includes five classrooms, two locker rooms, and two restrooms, with fire sprinklers, epoxy flooring, and brick wainscoting to match the existing school. Cost-effective modular construction allowed Pawnee ISD to complete the project without a bond, preserving financial flexibility. This successful collaboration underscores our commitment to delivering quality, efficient modular solutions for educational needs.

Read More »

Yakima School District Discovery Early Learning Academy

The Yakima School District faced an urgent need for additional space to accommodate the growing number of children enrolling in their daycare program. Recognizing the need for a rapid and cost-effective solution, they chose to expand their existing facilities with a modular building. This approach not only ensured timely completion despite unforeseen challenges but also offered superior quality and budget predictability compared to traditional stick-built construction.

Read More »