New and Noteworthy

Unlock the potential of modular construction with our insightful blog. Discover the advantages, innovations, and success stories in this growing industry. Dive in now!

County of Ventura Medical Clinic

County of Ventura Medical Center

This mental health rehab center was built for the County of Ventura Medical Center to accommodate hospital expansion. 

This mental health facility was constructed to house mental health patients with the intent to create a warm, inviting lodge type building versus a sterile hospital looking design. Stack stone, exposed beam construction, stained tongue and groove soffits accomplished that goal. A 12’ wide covered porch along three sides of the building added 3,800 Sf of outdoor environment for patients to enjoy. Skylights and solatubes added natural daylight throughout the buildings. A full service kitchen with commercial hood was located next to a general meeting area with 12’ high ceilings. Additional requirements for an anti-suicide environment were incorporated into the
design such as breakaway shower rods, closet rods, as well as a hard lid ceiling as t-grid did not meet the requirements. High quality Meko window shades reduced cooling requirements needed for the warm environment.

SHARE POST

Subscribe to Our Blog

Related Posts

Pawnee ISD Education Building

Pacific Mobile Structures recently completed a 5,280-square-foot permanent modular education building for Pawnee Independent School District (ISD) in just 66 days. In partnership with Palomar Modular Buildings, Villagomez Engineering, and L & I Transport Inc., we provided a timely solution to the district’s urgent need for space due to growing student numbers. Despite challenges like limited site space and weather delays, we delivered the project on time.

The new facility includes five classrooms, two locker rooms, and two restrooms, with fire sprinklers, epoxy flooring, and brick wainscoting to match the existing school. Cost-effective modular construction allowed Pawnee ISD to complete the project without a bond, preserving financial flexibility. This successful collaboration underscores our commitment to delivering quality, efficient modular solutions for educational needs.

Read More »

Yakima School District Discovery Early Learning Academy

The Yakima School District faced an urgent need for additional space to accommodate the growing number of children enrolling in their daycare program. Recognizing the need for a rapid and cost-effective solution, they chose to expand their existing facilities with a modular building. This approach not only ensured timely completion despite unforeseen challenges but also offered superior quality and budget predictability compared to traditional stick-built construction.

Read More »