New and Noteworthy

Unlock the potential of modular construction with our insightful blog. Discover the advantages, innovations, and success stories in this growing industry. Dive in now!

City of Nehalem City Hall

This building was built to replace the City of Nehalem’s old city headquarters. 

This was a full turnkey project including site work, civil engineering, geotechnical engineering, building design, fabrication, installation and permitting. Site work included a retaining wall, wrap around walkway, sidewalks and landscaping. Preservation plans were set in place during construction to preserve a 100 year old tree that was located on the property. The interior of the building consisted of a 13’ finished floor was a requirement due to flood zone regulations. Porches give cover to 12’x14’ recessed entries which open to a hallway and an interior with light painted walls, multiple windows and access to the City Office, Council Chambers and public restrooms.

SHARE POST

Subscribe to Our Blog

Related Posts

Siuslaw High School

Siuslaw High School needed more classroom space and they needed to replace the lost administrative space before the fall, so they turned to modular construction for its cost-effectiveness and speed.

Read More »